Water, Wastewater, and Reclaimed Water Technical Specifications
 
DIVISION 2 - SITE WORK
Cover ( PDF, 95KB )


    SECTION 02070 - Boring and Jacking ( PDF, 23KB )

  1. PART 1 - GENERAL

      1.1 --- Description
      1.2 --- Reference Documents
      1.3 --- Related Work

  2. PART 2 - PRODUCT

      2.1 --- Pipe Casing
      2.2 --- Joints
      2.3 --- Carrier Pipe

  3. PART 3 - EXECUTION

      3.1 --- General
      3.2 --- Excavation
      3.3 --- Boring & Jacking
      3.4 --- Grouting
      3.5 --- Loss of Ground
      3.6 --- Tolerances
      3.7 --- Responsibility
      3.8 --- Installation of Pipe
      3.9 --- Insurance Requirements and Fees
      3.10 -- Successful Completion


  4. SECTION 02072 - Horizontal Directional Drill ( PDF, 30KB )

  5. PART 1 - GENERAL

      1.1 --- Description
      1.2 --- Reference Documents
      1.3 --- Related Work

  6. PART 2 - PRODUCTS

      2.1 --- Polyvinyl Chloride Pipe and Fittings

  7. PART 3 - EXECUTION/INSTALLATION
      3.1 --- Description

  8. SECTION 02080.1 - Water Mains and Appurtenances ( PDF, 106KB )

  9. PART 1 - GENERAL

      1.1 --- Description
      1.2 --- Reference Documents
      1.3 --- Shop Drawings and Submittals
      1.4 --- Related Work

  10. PART 2 - DESIGN

      2.1 --- Line Sizing Criteria
      2.2 --- Minimum Line Size
      2.3 --- Line Routing
      2.4 --- Depth of Cover
      2.5 --- Protection of Potable Water Systems
      2.6 --- Cross-Connection Control
      2.7 --- Metering Assemblies
      2.8 --- Service Connections
      2.9 --- Meters
      2.10 -- Fire Hydrant Spacing, Location & Flow
      2.11 -- Valve Location
      2.12 -- Pipe, Fittings, & Appurtenances
      2.13 -- Subaqueous Service Pipe & Aerial Crossing Pipe
      2.14 -- Blow-Off Assembly

  11. PART 3 - PRODUCTS

      3.1 --- Pipe Material
      3.2 --- Ductile Iron Pipe & Fittings
      3.3 --- Polyvinyl Chloride Pipe & Fittings
      3.4 --- Gaskets
      3.5 --- Polyethylene (PE) Pipe and Tubing
      3.6 --- Corporation Stops
      3.7 --- Curb Stops
      3.8 --- Dual Service Wyes
      3.9 --- Meter Boxes
      3.10 -- Valves
      3.11 -- Fire Hydrants
      3.12 -- Backflow Prevention Assemblies

  12. PART 4 - CONSTRUCTION
    • 4.1 --- Work at Highway or Railroad Crossings
      4.2 --- Preconstruction Pipe Inspection/Certification
      4.3 --- Installation
      4.4 --- Trench Excavation
      4.5 --- Handling & Cutting Pipe
      4.6 --- Pipe Laying
      4.7 --- Installing Joints
      4.8 --- Installing Appurtenances
      4.9 --- Water Service Connections
      4.10 -- Polyethylene (PE) Tube Encasement
      4.11 -- Backfill/Compaction
      4.12 -- Temporary Water Service for Construction
      4.13 -- Flushing & Cleaning
      4.14 -- Hydrostatic & Leakage Testing
      4.15 -- Disinfecting Water Systems
      4.16 -- Connection to Existing Water Mains

  13. PART 5 - PRESSURE TESTING FORMS
  14. SECTION 02080.2 - WATER EXHIBITS ( PDF, 3888KB )

    SECTION 02080.2 - WATER EXHIBITS ( DWF, 1550KB )

    SECTION 02081.1 - Gravity Wastewater Sewers & Appurtenances ( PDF, 84KB )

  15. PART 1 - GENERAL

      1.1 --- Description
      1.2 --- Reference Documents
      1.3 --- Shop Drawings and Submittals
      1.4 --- Related Work

  16. PART 2 - DESIGN

      2.1 --- Flow Criteria
      2.2 --- Minimum Line Size
      2.3 --- Alignment
      2.4 --- Depth of Cover
      2.5 --- Slope
      2.6 --- Horizontal Separation
      2.7 --- Crossings
      2.8 --- Gravity Laterals
      2.9 --- Wastewater Manholes
      2.10 -- Manhole Frames and Covers
      2.11 -- Connections to Gravity Systems
      2.12 -- Waterproof and Protective Coatings

  17. PART 3 - PRODUCTS

      3.1 --- Material
      3.2 --- PVC Pipe and Fittings
      3.3 --- Manholes
      3.4 --- Manhole Frames and Covers
      3.5 --- Mortar For Pipe and Manhole Riser
      3.6 --- Brick
      3.7 --- Waterproof and Protective Coatings

  18. PART 4 - CONSTRUCTION
    • 4.1 --- Work at Highway or Railroad Crossings
      4.2 --- Preconstruction Pipe Inspection/Certification
      4.3 --- Installation
      4.4 --- Trench Excavation
      4.5 --- Handling and Cutting Pipe
      4.6 --- Pipe Laying
      4.7 --- Installing Joints
      4.8 --- Installing Manholes
      4.9 --- Gravity Laterals
      4.10 -- Sleeves
      4.11 -- Backfill/Compaction
      4.12 -- Connections to Gravity Systems
      4.13 -- Taking Existing Wastewater Systems out of Service
      4.14 -- Inspection and Testing
  19. PART 5 – WASTEWATER PEAKING FACTOR
  20. PART 6 – TELEVISING OF LINES

  21. SECTION 02081.2 - Wastewater Force Mains and Appurtenances ( PDF, 75KB )

  22. PART 1 - GENERAL

      1.1 --- Description
      1.2 --- Reference Documents
      1.3 --- Shop Drawings and Submittals
      1.4 --- Related Work

  23. PART 2 - DESIGN

      2.1 --- Flow Criteria
      2.2 --- Minimum Line Size
      2.3 --- Depth of Cover
      2.4 --- Horizontal Separation
      2.5 --- Crossings
      2.6 --- Pipe, Fittings, and Appurtenances
      2.7 --- Valves
      2.8 --- Connections to County Systems

  24. PART 3 - PRODUCT

      3.1 --- Material
      3.2 --- Polyvinyl Chloride Pipe and Fittings
      3.3 --- Ductile Iron Pipe and Fittings
      3.4 --- Gaskets
      3.5 --- Valves and Appurtenances

  25. PART 4 - CONSTRUCTION

      4.1 --- Work at Highway or Railroad Crossings
      4.2 --- Preconstruction Pipe Inspection/Certification
      4.3 --- Installation
      4.4 --- Trench Excavation
      4.5 --- Handling and Cutting Pipe
      4.6 --- Pipe Laying
      4.7 --- Installing Joints
      4.8 --- Installing Appurtenances
      4.9 --- Backfill/Compaction
      4.10 -- Flushing and Cleaning
      4.11 -- Hydrostatic and Leakage Test
      4.12 -- Connections to Existing System

  26. PART 5 - WASTEWATER PEAKING FACTORS
  27. PART 6 - PRESSURE TESTING FORMS


  28. SECTION 02081.3 - Wastewater Pumping Station ( PDF, 182KB )

  29. PART 1 - GENERAL

      1.1 --- Description
      1.2 --- Reference Documents
      1.3 --- Shop Drawings and Submittals
      1.4 --- Tools and Spare Parts
      1.5 --- As-Built/Record Drawings
      1.6 --- Related Work

  30. PART 2 - DESIGN AND CONTRUCTION STANDARDS

      2.1 --- Siting Requirements
      2.2 --- Horizontal Separation
      2.3 --- Crossing
      2.4 --- Flow
      2.5 --- Total Dynamic Head (TDH)
      2.6 --- System Head versus Pump Capacity Analysis
      2.7 --- Electrical Classification
      2.8 --- Pumps
      2.9 --- Wet Wells
      2.10 – Piping Design
      2.11 – Station Access

  31. PART 3 - PRODUCT

      3.1 --- Wet Well
      3.2 --- Discharge Piping and Appurtenances
      3.3 --- Wastewater Pumps
      3.4 --- Potable Water Faucets
      3.5 --- Pumping Station Controls
      3.6 --- Remote Telemetry and Appurtenances
      3.7 --- Conduit Systems
      3.8 --- Wiring Systems
      3.9 --- Pressure Taps and Pressure Measuring Systems
      3.10 – Level Measuring System
      3.11 – Level Detection Switches

  32. PART 4 - CONSTRUCTION

      4.1 --- Site Work
      4.2 --- Wet Well
      4.3 --- Equipment
      4.4 --- Electrical
      4.5 --- Installation – Remote Telemetry Units and Appurtenances
      4.6 --- Site Paving and Fencing
      4.7 --- Final Inspection and Testing

  33. PART 5 – WASTEWATER PEAKING FACTORS
  34. PART 6 – WASTEWATER PUMPING STATION CONSTRUCTION START-UP PROCEDURE
  35. SECTION 02081.5 - Pump Station Control and SCADA Requirements ( PDF, 25KB )

    SECTION 02081.6 - Wastewater Exhibits ( PDF, 2383KB )
    SECTION 02081.6 - Wastewater Exhibits ( DWF, 1243KB )

    SECTION 02083.1 - Reclaimed Water Mains and Appurtenances ( PDF, 115KB )

  36. PART 1 - GENERAL

      1.1 --- Description
      1.2 --- Reference Documents
      1.3 --- Shop Drawing Submittals
      1.4 --- Related Work

  37. PART 2 - DESIGN

      2.1 --- General
      2.2 --- Line Sizing Criteria
      2.3 --- Depth of Cover
      2.4 --- Separation of Reclaimed Water, Potable Water, and Sewer Lines
      2.5 --- Cross-Connection Control
      2.6 --- Golf Courses and Other Major Uses
      2.7 --- Meters and Other Metering Assemblies
      2.8 --- Service Connections
      2.9 --- Valves and Valve Locations
      2.10 – Pipe, Fittings, and Appurtenances
      2.11 – System Identification and Signage
      2.12 – Subaqueous Service Pipe and Aerial Crossing Pipe
      2.13 – Hose Bibb Assembly
      2.14 – Blow-off assembly

  38. PART 3 - PRODUCT

      3.1 --- Pipe Material
      3.2 --- Ductile Iron Pipe and Fittings
      3.3 --- Polyvinyl Pipe and Fittings
      3.4 --- Gaskets
      3.5 --- Polyethylene (PE) Pipe and Tubing
      3.6 --- Corporation Stops
      3.7 --- Curb Stops
      3.8 --- Dual Service Wyes
      3.9 --- Valves
      3.10 – Meter Specifications
      3.11 – Backflow Prevention Assemblies
      3.12 – Hose Bibb Assembly

  39. PART 4 - CONSTRUCTION

      4.1 --- Work at Highway and Railroad Crossings
      4.2 --- Preconstruction Pipe Inspection/Certification
      4.3 --- Installation
      4.4 --- Trench Excavation
      4.5 --- Handling and Cutting Pipe
      4.6 --- Pipe Laying
      4.7 --- Installing Joints
      4.8 --- Installing Appurtenances
      4.9 --- Golf Courses and Other Major Uses.
      4.10 – Service Connections
      4.11 – Hose Bibb Connection Assembly
      4.12 – Installing Back-Flow Prevention Devices
      4.13 – Polyethylene Tube Encasement
      4.14 – Backfill/Compaction
      4.15 – Temporary Potable Water Service for Construction
      4.16 – Flushing and Cleaning
      4.17 – Hydrostatic and Leakage Test
      4.18 – Connection to Existing Reclaimed Water Mains

  40. PART 5 - PIPE SIZING CRITERIA

      5.1 --- Design Standard for Reclaimed Water Distribution Systems
      5.2 --- Residential Subdivisions
      5.3 --- Commercial Developments

  41. PART 6 – PRESSURE TESTING FORMS

    SECTION 02083.2 - Reclaimed Water Exhibits ( PDF, 3187KB )
    SECTION 02083.2 - Reclaimed Water Exhibits ( DWF, 1352KB )

 

 

    DIVISION 3 - CONCRETE

    SECTION 03010 - Concrete Reinforcement ( PDF, 24KB )

  1. PART 1 - GENERAL

      1.1 --- Description
      1.2 --- Reference Documents
      1.3 --- Quality Assurance
      1.4 --- Shop Drawings and Submittals
      1.5 --- Related Work
      1.6 --- Product Delivery, Storage and Handling

  2. PART 2 - PRODUCT

      2.1 --- General
      2.2 --- Material

  3. PART 3 - EXECUTION

      3.1 -- Cutting and Bending - Reinforcement
      3.2 --- Bar Supports and Spacers
      3.3 --- Steel Reinforcement
      3.4 --- Splicing
      3.5 --- Concrete Protection for Reinforcement
      3.6 --- Field Quality Control

    SECTION 03020 - Cast-In-Place Concrete ( PDF, 58KB )

  4. PART 1 - GENERAL

      1.1 --- Description
      1.2 --- Reference Documents
      1.3 --- Quality Assurance
      1.4 --- Submittals
      1.5 --- Related Work
      1.6 --- Product Delivery, Storage and Handling

  5. PART 2 - PRODUCT

      2.1 --- Materials

  6. PART 3 - EXECUTION

      3.1 --- Field Quality Control
      3.2 --- Material Preparation
      3.3 --- Conveying
      3.4 --- Preparation for Placement
      3.5 --- Placement
      3.6 --- Curing and Protecting
      3.7 --- Weather Protection
      3.8 --- Defective Concrete
      3.9 --- Damaged Work
      3.10 -- Tolerance for Concrete Construction

    SECTION 03030 - Forms and Formwork ( PDF, 19KB )

  7. PART 1 - GENERAL

      1.1 --- Description
      1.2 --- Reference Documents
      1.3 --- Related Work
      1.4 --- Quality Assurance
      1.5 --- Submittals
      1.6 --- Product Delivery, Storage and Handling

  8. PART 2 - PRODUCT

      2.1 --- Forms and Accessories

  9. PART 3 - EXECUTION

      3.1 --- Fabrication
      3.2 --- Preparation
      3.3 --- Installation, Removal & Reshoring
      3.4 --- Embedded Items
      3.5 --- Field Quality Control
      3.6 --- Joints
      3.7 --- Removal of Forms, Falsework & Centering

  10. APPENDICES