|
|
|
|
|
| |
| DIVISION 2 - SITE WORK |
Cover ( PDF, 95KB )
SECTION 02070 - Boring and Jacking ( PDF, 23KB )
- PART 1 - GENERAL
- PART 2 - PRODUCT
- PART 3 - EXECUTION
3.1 --- General
3.2 --- Excavation
3.3 --- Boring & Jacking
3.4 --- Grouting
3.5 --- Loss of Ground
3.6 --- Tolerances
3.7 --- Responsibility
3.8 --- Installation of Pipe
3.9 --- Insurance Requirements and Fees
3.10 -- Successful Completion
SECTION 02072 - Horizontal Directional Drill ( PDF, 30KB )
- PART 1 - GENERAL
- PART 2 - PRODUCTS
- PART 3 - EXECUTION/INSTALLATION
SECTION 02080.1 - Water Mains and Appurtenances ( PDF, 106KB )
- PART 1 - GENERAL
1.1 --- Description
1.2 --- Reference Documents
1.3 --- Shop Drawings and Submittals
1.4 --- Related Work
- PART 2 - DESIGN
2.1 --- Line Sizing Criteria
2.2 --- Minimum Line Size
2.3 --- Line Routing
2.4 --- Depth of Cover
2.5 --- Protection of Potable Water Systems
2.6 --- Cross-Connection Control
2.7 --- Metering Assemblies
2.8 --- Service Connections
2.9 --- Meters
2.10 -- Fire Hydrant Spacing, Location & Flow
2.11 -- Valve Location
2.12 -- Pipe, Fittings, & Appurtenances
2.13 -- Subaqueous Service Pipe & Aerial Crossing Pipe
2.14 -- Blow-Off Assembly
- PART 3 - PRODUCTS
3.1 --- Pipe Material
3.2 --- Ductile Iron Pipe & Fittings
3.3 --- Polyvinyl Chloride Pipe & Fittings
3.4 --- Gaskets
3.5 --- Polyethylene (PE) Pipe and Tubing
3.6 --- Corporation Stops
3.7 --- Curb Stops
3.8 --- Dual Service Wyes
3.9 --- Meter Boxes
3.10 -- Valves
3.11 -- Fire Hydrants
3.12 -- Backflow Prevention Assemblies
- PART 4 - CONSTRUCTION
4.1 --- Work at Highway or Railroad Crossings
4.2 --- Preconstruction Pipe Inspection/Certification
4.3 --- Installation
4.4 --- Trench Excavation
4.5 --- Handling & Cutting Pipe
4.6 --- Pipe Laying
4.7 --- Installing Joints
4.8 --- Installing Appurtenances
4.9 --- Water Service Connections
4.10 -- Polyethylene (PE) Tube Encasement
4.11 -- Backfill/Compaction
4.12 -- Temporary Water Service for Construction
4.13 -- Flushing & Cleaning
4.14 -- Hydrostatic & Leakage Testing
4.15 -- Disinfecting Water Systems
4.16 -- Connection to Existing Water Mains
- PART 5 - PRESSURE TESTING FORMS
SECTION 02080.2 - WATER EXHIBITS ( PDF, 3888KB )
SECTION 02080.2 - WATER EXHIBITS ( DWF, 1550KB )
SECTION 02081.1 - Gravity Wastewater Sewers & Appurtenances ( PDF, 84KB )
- PART 1 - GENERAL
1.1 --- Description
1.2 --- Reference Documents
1.3 --- Shop Drawings and Submittals
1.4 --- Related Work
- PART 2 - DESIGN
2.1 --- Flow Criteria
2.2 --- Minimum Line Size
2.3 --- Alignment
2.4 --- Depth of Cover
2.5 --- Slope
2.6 --- Horizontal Separation
2.7 --- Crossings
2.8 --- Gravity Laterals
2.9 --- Wastewater Manholes
2.10 -- Manhole Frames and Covers
2.11 -- Connections to Gravity Systems
2.12 -- Waterproof and Protective Coatings
- PART 3 - PRODUCTS
3.1 --- Material
3.2 --- PVC Pipe and Fittings
3.3 --- Manholes
3.4 --- Manhole Frames and Covers
3.5 --- Mortar For Pipe and Manhole Riser
3.6 --- Brick
3.7 --- Waterproof and Protective Coatings
- PART 4 - CONSTRUCTION
4.1 --- Work at Highway or Railroad Crossings
4.2 --- Preconstruction Pipe Inspection/Certification
4.3 --- Installation
4.4 --- Trench Excavation
4.5 --- Handling and Cutting Pipe
4.6 --- Pipe Laying
4.7 --- Installing Joints
4.8 --- Installing Manholes
4.9 --- Gravity Laterals
4.10 -- Sleeves
4.11 -- Backfill/Compaction
4.12 -- Connections to Gravity Systems
4.13 -- Taking Existing Wastewater Systems out of Service
4.14 -- Inspection and Testing
- PART 5 – WASTEWATER PEAKING FACTOR
- PART 6 – TELEVISING OF LINES
SECTION 02081.2 - Wastewater Force Mains and Appurtenances ( PDF, 75KB )
- PART 1 - GENERAL
1.1 --- Description
1.2 --- Reference Documents
1.3 --- Shop Drawings and Submittals
1.4 --- Related Work
- PART 2 - DESIGN
2.1 --- Flow Criteria
2.2 --- Minimum Line Size
2.3 --- Depth of Cover
2.4 --- Horizontal Separation
2.5 --- Crossings
2.6 --- Pipe, Fittings, and Appurtenances
2.7 --- Valves
2.8 --- Connections to County Systems
- PART 3 - PRODUCT
3.1 --- Material
3.2 --- Polyvinyl Chloride Pipe and Fittings
3.3 --- Ductile Iron Pipe and Fittings
3.4 --- Gaskets
3.5 --- Valves and Appurtenances
- PART 4 - CONSTRUCTION
4.1 --- Work at Highway or Railroad Crossings
4.2 --- Preconstruction Pipe Inspection/Certification
4.3 --- Installation
4.4 --- Trench Excavation
4.5 --- Handling and Cutting Pipe
4.6 --- Pipe Laying
4.7 --- Installing Joints
4.8 --- Installing Appurtenances
4.9 --- Backfill/Compaction
4.10 -- Flushing and Cleaning
4.11 -- Hydrostatic and Leakage Test
4.12 -- Connections to Existing System
- PART 5 - WASTEWATER PEAKING FACTORS
- PART 6 - PRESSURE TESTING FORMS
SECTION 02081.3 - Wastewater Pumping Station ( PDF, 182KB )
- PART 1 - GENERAL
1.1 --- Description
1.2 --- Reference Documents
1.3 --- Shop Drawings and Submittals
1.4 --- Tools and Spare Parts
1.5 --- As-Built/Record Drawings
1.6 --- Related Work
- PART 2 - DESIGN AND CONTRUCTION STANDARDS
2.1 --- Siting Requirements
2.2 --- Horizontal Separation
2.3 --- Crossing
2.4 --- Flow
2.5 --- Total Dynamic Head (TDH)
2.6 --- System Head versus Pump Capacity Analysis
2.7 --- Electrical Classification
2.8 --- Pumps
2.9 --- Wet Wells
2.10 – Piping Design
2.11 – Station Access
- PART 3 - PRODUCT
3.1 --- Wet Well
3.2 --- Discharge Piping and Appurtenances
3.3 --- Wastewater Pumps
3.4 --- Potable Water Faucets
3.5 --- Pumping Station Controls
3.6 --- Remote Telemetry and Appurtenances
3.7 --- Conduit Systems
3.8 --- Wiring Systems
3.9 --- Pressure Taps and Pressure Measuring Systems
3.10 – Level Measuring System
3.11 – Level Detection Switches
- PART 4 - CONSTRUCTION
4.1 --- Site Work
4.2 --- Wet Well
4.3 --- Equipment
4.4 --- Electrical
4.5 --- Installation – Remote Telemetry Units and Appurtenances
4.6 --- Site Paving and Fencing
4.7 --- Final Inspection and Testing
- PART 5 – WASTEWATER PEAKING FACTORS
- PART 6 – WASTEWATER PUMPING STATION CONSTRUCTION START-UP PROCEDURE
SECTION 02081.5 - Pump Station Control and SCADA Requirements ( PDF, 25KB )
SECTION 02081.6 - Wastewater Exhibits ( PDF, 2383KB )
SECTION 02081.6 - Wastewater Exhibits ( DWF, 1243KB )
SECTION 02083.1 - Reclaimed Water Mains and Appurtenances ( PDF, 115KB )
- PART 1 - GENERAL
1.1 --- Description
1.2 --- Reference Documents
1.3 --- Shop Drawing Submittals
1.4 --- Related Work
- PART 2 - DESIGN
2.1 --- General
2.2 --- Line Sizing Criteria
2.3 --- Depth of Cover
2.4 --- Separation of Reclaimed Water, Potable Water, and Sewer Lines
2.5 --- Cross-Connection Control
2.6 --- Golf Courses and Other Major Uses
2.7 --- Meters and Other Metering Assemblies
2.8 --- Service Connections
2.9 --- Valves and Valve Locations
2.10 – Pipe, Fittings, and Appurtenances
2.11 – System Identification and Signage
2.12 – Subaqueous Service Pipe and Aerial Crossing Pipe
2.13 – Hose Bibb Assembly
2.14 – Blow-off assembly
- PART 3 - PRODUCT
3.1 --- Pipe Material
3.2 --- Ductile Iron Pipe and Fittings
3.3 --- Polyvinyl Pipe and Fittings
3.4 --- Gaskets
3.5 --- Polyethylene (PE) Pipe and Tubing
3.6 --- Corporation Stops
3.7 --- Curb Stops
3.8 --- Dual Service Wyes
3.9 --- Valves
3.10 – Meter Specifications
3.11 – Backflow Prevention Assemblies
3.12 – Hose Bibb Assembly
- PART 4 - CONSTRUCTION
4.1 --- Work at Highway and Railroad Crossings
4.2 --- Preconstruction Pipe Inspection/Certification
4.3 --- Installation
4.4 --- Trench Excavation
4.5 --- Handling and Cutting Pipe
4.6 --- Pipe Laying
4.7 --- Installing Joints
4.8 --- Installing Appurtenances
4.9 --- Golf Courses and Other Major Uses.
4.10 – Service Connections
4.11 – Hose Bibb Connection Assembly
4.12 – Installing Back-Flow Prevention Devices
4.13 – Polyethylene Tube Encasement
4.14 – Backfill/Compaction
4.15 – Temporary Potable Water Service for Construction
4.16 – Flushing and Cleaning
4.17 – Hydrostatic and Leakage Test
4.18 – Connection to Existing Reclaimed Water Mains
- PART 5 - PIPE SIZING CRITERIA
5.1 --- Design Standard for Reclaimed Water Distribution Systems
5.2 --- Residential Subdivisions
5.3 --- Commercial Developments
- PART 6 – PRESSURE TESTING FORMS
SECTION 02083.2 - Reclaimed Water Exhibits ( PDF, 3187KB )
SECTION 02083.2 - Reclaimed Water Exhibits ( DWF, 1352KB )
|
DIVISION 3 - CONCRETE
SECTION 03010 - Concrete Reinforcement ( PDF, 24KB )
- PART 1 - GENERAL
1.1 --- Description
1.2 --- Reference Documents
1.3 --- Quality Assurance
1.4 --- Shop Drawings and Submittals
1.5 --- Related Work
1.6 --- Product Delivery, Storage and Handling
- PART 2 - PRODUCT
- PART 3 - EXECUTION
3.1 -- Cutting and Bending - Reinforcement
3.2 --- Bar Supports and Spacers
3.3 --- Steel Reinforcement
3.4 --- Splicing
3.5 --- Concrete Protection for Reinforcement
3.6 --- Field Quality Control
SECTION 03020 - Cast-In-Place Concrete ( PDF, 58KB )
- PART 1 - GENERAL
1.1 --- Description
1.2 --- Reference Documents
1.3 --- Quality Assurance
1.4 --- Submittals
1.5 --- Related Work
1.6 --- Product Delivery, Storage and Handling
- PART 2 - PRODUCT
- PART 3 - EXECUTION
3.1 --- Field Quality Control
3.2 --- Material Preparation
3.3 --- Conveying
3.4 --- Preparation for Placement
3.5 --- Placement
3.6 --- Curing and Protecting
3.7 --- Weather Protection
3.8 --- Defective Concrete
3.9 --- Damaged Work
3.10 -- Tolerance for Concrete Construction
SECTION 03030 - Forms and Formwork ( PDF, 19KB )
- PART 1 - GENERAL
1.1 --- Description
1.2 --- Reference Documents
1.3 --- Related Work
1.4 --- Quality Assurance
1.5 --- Submittals
1.6 --- Product Delivery, Storage and Handling
- PART 2 - PRODUCT
- PART 3 - EXECUTION
3.1 --- Fabrication
3.2 --- Preparation
3.3 --- Installation, Removal & Reshoring
3.4 --- Embedded Items
3.5 --- Field Quality Control
3.6 --- Joints
3.7 --- Removal of Forms, Falsework & Centering
- APPENDICES
|
|
|
|