Printed from:
http://hillsboroughcounty.org/water/technicalmanual/home.cfm
on 11/21/2009
Water, Wastewater, and Reclaimed Water Technical Manual for Subdivision and Site Development
TECHNICAL MANUAL: COVER, APPROVAL & TABLE OF CONTENTS
( PDF, 321KB )
SECTION 1 - PROJECT REVIEW AND ACCEPTANCE PROCESS
( PDF, 37KB )
1.1 Introduction
1.2 Project Review Process
1.3 Right-of-Way Use Permit Submittals
1.4 Dedication of Easements
1.5 Authority of Inspectors
1.6 Requirements of Acceptance
1.7 Utilities Product Review Committee
1.8 Technical Manual Revision Procedure
SECTION 2 - PREPARATION OF MASTER PLANS, CONSTRUCTION PLANS, AND RECORD DRAWINGS
( PDF, 34KB )
2.1 Master Plan
2.2 Construction Plan Format
2.3 Standard Items for Construction Plan Review
2.4 Record Drawing Submittals
SECTION 3 - SPECIFICATIONS FOR DRINKING WATER DISTRIBUTION SYSTEMS DESIGN STANDARDS
( PDF, 117KB )
3.1 General
3.2 Plans Preparation
3.3 Plans Review
3.4 System Design and Flow Criteria
3.5 Water Details
SECTION 4 - SPECIFICATIONS FOR WASTEWATER COLLECTION/ TRANSMISSION SYSTEMS DESIGN STANDARDS
( PDF, 114KB )
4.1 General
4.2 Plans Preparation
4.3 Plans Review
4.4 System Design and Flow Criteria
4.5 Wastewater Detail
SECTION 5 - SPECIFICATIONS FOR RECLAIMED WATER SYSTEM DESIGN
( PDF, 16KB )
5.1 General
5.2 Plans Preparation
5.3 Plans Review
5.4 Project Acceptance
5.5 System Design
5.6 Reclaimed Water Details
APPENDICES
1
Construction Plan Check List
( PDF, 18KB )
2
Water Flow Peaking Factors
( PDF, 8KB )
3
Construction Feature Information
( PDF, 7KB )
Asset Data Entry Spreadsheet
( XLS, 212KB )
4
Oversizing Process and Oversizing Reimbursement Program
( PDF, 981KB )
5
Wastewater Flow Peaking Factors
( PDF, 8KB )